PMP are an approved consultant to EDF Energy, appointed via their Facilities Management supplier Workplace Solutions, to undertake non-nuclear Building / Condition inspections across their UK sites. To date, PMP have undertaken surveys of all non-nuclear buildings at Hunterston B Power Station in Scotland, Hartlepool Power Station in the North East of England and are soon to commence Haysham 1 Power Station, in the North West of England. Typically each station includes around 150 buildings, of differing age and construction type and demonstrates PMP’s ability to act upon large portfolios across the whole of the UK.

PMP Role

PMP work alongside Workplace Solutions to inspect the structure and fabric of specific non-nuclear buildings, providing comment on age, construction type, building defects, recommendations for repair and associated budget costs. PMP work to extremely stringent Method Statements and Risk Assessments, approved by each individual site. Typically building survey work is completed over a 3 week period, with a similar timeline for reporting.

Key actions undertaken

  • Building Inspections
  • Defect analysis
  • Commentary on repair process
  • Cost analysis

Featured Case Studies

Hillington Park_case study image mono

Hillington Park

112 Ingram Street_case study image mono

112 Ingram Street – The Garment Factory

Quartermile_case study image mono

Quartermile 1

Menu